Bridges (Road, Rail & Elevated Metro)
A bridge is a structure built to span physical obstacles without closing the way underneath such as a body of water, valley, or road, for the purpose of providing passage over the obstacle. There are many different designs that each serve a particular purpose and apply to different situations. Designs of bridges vary depending on the function of the bridge, the nature of the terrain where the bridge is constructed and anchored, the material used to make it, and the funds available to build it.
6 Lane Steel Flyover Bangalore, India
Barajaguli to Krishnanagar NH 34 Kolkata, India
Construction of North-South Elevated Corridor - Bangalore,India
Sharavati Extra dosed bridge - Shimoga, India
Animation completed in 2020
Client Objective: To show the construction and working of the bridge for better and faster connectivity for the locals, reduction of time travel, reducing pollution
Actual Duration: 3 minutes
Client Name: Dilip Buildcon Ltd.
Byculla cable stayed bridge - Mumbai, India
Animation completed in 2020
Client Objective: Strategic connectivity to reduce time travel in a very congested area.
Actual Duration: 14 minutes
Client Name: Ramboll Consultants
Anji Khad Cable Stayed Bridge - Jammu, India
Animation completed in 2019
Client Objective: Strategic connectivity to reduce time travel in a high altitude area.
Actual Duration:14 minutes
Client Name: HCC Ltd.
Indore Metro - Indore, India
Animation completed in 2019
Client Objective: To show the construction and working of the metro for better and faster connectivity for the locals, reduction of time travel, reducing pollution
Actual Duration: 6 minutes
Client Name: Dilip Buildcon Ltd.
Construction of North -south elevated Corridor - Bangalore, Karnataka, India
Animation completed in 2019
Client Objective: An attempt to decongest the vehicular traffic in the city of Bangalore
Actual Duration:15 minutes
Client Name: Larsen & Toubro Ltd.
Katgora Bridge - Chattisgarh, India
Animation completed in 2018
Client Objective: Connectivity over the river as a part of the package to reduce transit time from Katghora to Shivanagar.
Actual Duration: 8 minutes
Client Name: Dilip Buildcon Ltd.
Bhopal Metro -Bhopal, India
Animation completed in 2018
Client Objective: To show the construction and working of the metro for better and faster connectivity for the locals, reduction of time travel and reducing pollution.
Actual Duration: 12 minutes
Client Name: Dilip Buildcon Ltd.
Mumbai Metro Line 3 - Mumbai, India
Animation completed in 2018
Client Objective: Construction of MM Line 3 and design of underground station on DN Road near Flora Fountain.
Actual Duration: 19 minutes (detailed construction)
Client Name: Larsen & Toubro Ltd.
Ram Jhula Cable stayed Bridge - Nagpur, India
Animation Completed in 2018
Client Objective: Construction of six lane cable stayed bridge over Nagpur station for better connectivity
Actual Duration: 37 minutes (detailed construction)
Client Name: Afcons Infrastructure Ltd.
Zuari cable stayed bridge - Goa, India
Animation Completed in 2017
Client Objective: Better connectivity, traffic management and to reduce travel time.
Actual Duration: 8 minutes
Client Name: Dilip Buildcon
Mahatma Gandhi Setu Bridge -Patna, India
Animation Completed in 2017
Description: Diversion of traffic for rebuilding bridge sections
Client Objective: To explain end to end traffic diversion and management over the bridge as the bridge goes into repair and construction
Actual Duration: 6 minutes in English and in Hindi
Client Name: Afcons Infrastructure ltd
Light Rapid Transit Concept Presentation for Mauritius
Animation Completed in 2014
Description: Presentation Concept for better connectivity within Mauritius to boost tourism without disturbing the existing structures
Client Objective: To explain point to point connectivity within the city and improve tourism and quality of life in general
Actual Duration: 6 minutes
Client Name: Afcons Infrastructure ltd
Extra Dosed Cable Stayed Bridge at Arra-Chapra, Bihar, India
Animation completed in 2014
Description: Walkthrough + Construction of Extra dosed Cable Stayed Road Bridge, Bihar, India.
Client Objective: To explain the degree of complexity of the construction, client expertise and national connectivity
Actual Duration: 11.5 minutes
Client Name: S. P. Singla Construction PVT. LTD.
Pier Inspection Platform for the worlds tallest bridge - Chenab, Jammu, India
Animation completed in 2013
Client Objective: To show the construction and working of the pier inspection platform for better monitoring of construction at high altitudes.
Actual Duration:1 minutes
Client Name: Afcons Infrastructure Ltd.
Elevated Corridor Concept for Lusaka, Zambia
Animation Completed in 2013
Description: Presentation Concept for Elevated Corridor Concept for road traffic decongestion in Lusaka, Zambia
Client Objective: To explain how the road traffic of a busy city can be reduced and quality of life can be improved
Actual Duration: 7 minutes
Client Name: Afcons Infrastructure ltd
Basohli Cable Stayed Bridge - Jammu, India
Animation Completed in 2012
Description: Walkthrough + Construction of Basohli Cable Stayed Road Bridge, Jammu, India.
Client Objective: To explain the degree of complexity of the construction, client expertise and pride in constructing a bridge of national importance Presented to Honorable Defense Minister Mr. Manohar Parrikar
Actual Duration: 10 minutes
Client Name: S. P. Singla Construction PVT. LTD.
Bogibeel Rail and Road Bridge - Dibrugarh, Assam, India
Animation completed in 2012
Description: Walkthrough + Construction of Bogibeel Rail cum Road bridge, Assam, India.
Client Objective: To explain the degree of complexity of the construction, client expertise and pride in constructing a bridge of national importance
Actual Duration: 30 minutes
Client Name: Hindustan Construction Company (HCC)
Grade Separator between Rajaram Kohli & Shastri Nagar - Delhi, India
Animation completed in 2009
Description: Walkthrough + Construction of Grade separator between Rajaram Kohli and Shastri Nagar, Delhi, India.
Client Objective: To explain the degree of complexity of the construction, client expertise in complex connectivity
Actual Duration: 12 minutes
Client Name: Afcons Infrastructure ltd
Vallarpadam Railway Link - Cochin, India
Animation completed in 2008
Description: Walkthrough + Construction of Vallarpadam Railway Link bridge, Kerala, India.
Client Objective: To explain the degree of complexity of the construction and client expertise
Actual Duration: 23 minutes
Client Name: Afcons Infrastructure Ltd.